The main characteristics of the object

Length: 10.2 km

 

The Podilskyi Bridge crossing construction began in 2004.

According to the master plan for the development of Kyiv, the estimated traffic intensity at the Podilskyi Bridge crossing will be 60,000 cars per hour in the given units. It is clear that to receive and distribute this traffic flow, this facility must have a developed network of highways on the banks with interchanges at different levels at its intersections with the main road network.

The northern part of the city’s Left Bank covers most of the Desnianskyi and Dniprovskyi districts. Here are located residential areas of Vygurivshchyna-Troyeshchyna, Raiduzhnyi, Voskresenka, Lisovyi and others. The total population is over 500 thousand people. The calculation scheme of the Master Plan of Kyiv takes into account the construction of Osokorky – Troieshchyna highways in the future.

The construction of this facility involves 5 stages. The composition includes a large number of artificial structures, including 3 large combined elevated expressways, overpasses, retaining walls, etc.

1st stage – Arrangement of exits from from the Podilskyi Bridge crossing to the Rybalskyi Peninsula and to the Naberezhno-Khreschatytska Street in the Podilskyi district of Kyiv with the construction of the Naberezhno-Rybalska road, the bridge across the Harbor (Havan) and the overpass along the street of Naberezhno-Khreschatytska.

  (fully commissioned in 2010, certificate of conformity КВ 000428 issued on 22.10.2010)

2nd stage – Construction of the from the Podilskyi Bridge crossing over the Dnieper River in Kyiv from the street of Mezhyhirska along with Rusanivsky gardens (under construction).

(in the process of construction under the duly approved project)

3rd stage – Arrangement of exits from the Podilskyi Bridge crossing to the Rybalskyi Peninsula and street of Naberezhno-Khreschatytska in the Podilskyi district of Kyiv as part of the Podilskyi Bridge crossing over the Dnieper River (exit №7 from the Podilskyi Bridge crossing on Naberezhno-Rybalska Street)

(in the process of construction completion following the approved project)

4th stage – Construction of exit on the Podilskyi Bridge crossing from the street of Naberezhno-Khreschatytska near the street of Verhnii-Nyzhnii Val as part of the construction of the Podilskyi Bridge crossing over the Dnieper River in Kyiv.

 (in the process of construction following the approved project)

5th turn – Country buildings resettlement of Rusanivsky and Voskresensky gardens on the street of Radystiv in the Desnianskyi district of Kyiv.

(in the process of construction completion following the approved project)